Façade & External Repairs

Façade Repairs Done in Place & Built to Last.

Façade repairs to brickwork, render, sealant and cladding, carried out in place across Merseyside, Lancashire and Greater Manchester.

REPAIRS WITHOUT SCAFFOLDING THE WHOLE ELEVATION

Most façade defects are localised. A failed sealant joint, a section of blown render, a few metres of perished pointing. Scaffolding an entire elevation to reach them costs more in standing time than the repair itself, and it takes the pavement and the parking with it.

Working on rope, we get to the defect directly. Ropes go up in a morning and come down when the job is finished, so a repair that would have been priced around three weeks of scaffold hire becomes a short, self-contained visit.

Every job starts with a free site visit. Tom will look at the elevation, tell you what is actually wrong, and put the method and the price in writing before anyone goes near a rope.

Snapshot

TYPICAL BUILDINGS

Offices, apartment blocks, industrial units, listed and heritage buildings

TYPICAL DURATION

An estimated duration will be provided as part of the booking process.

COMPLIANCE

Site-specific risk assessment and method statement issued before work starts

SPECIALIST FAÇADE WORK

The specific jobs that come up most often on external elevations.

CLADDING REPAIRS

Repair and replacement of localised damaged or loose panels. Wind-lifted edges, failed fixings and impact damage are dealt with panel by panel rather than by stripping a whole bay. We photograph the fixing condition either side of the damage so you know whether the problem is isolated.

MASTIC & SEALANT REPAIRS

High-level replacement of failed perimeter seals and movement joints. Perished mastic around window and panel perimeters is one of the most common causes of water ingress we find, and one of the cheapest to put right once the failed run has been identified.

BRICKWORK & REPOINTING

Localised masonry repairs and repointing on elevations that are difficult to reach. Mortar is matched to the existing work, which matters on older and listed buildings where a hard modern mix can do more damage than the open joint it replaced.

Why Rope Access?

THE ACCESS SHOULD NOT COST MORE THAN THE REPAIR.

On a façade job the repair itself is often a day's work. What makes it expensive is everything around it: the hire period, the licence if the scaffold crosses a pavement, a week to erect and a week to strike. Rope access removes that, and it leaves the entrance, the car park and the ground floor tenants alone while we work.

Common Questions

Do you work alongside scaffolding?

We can work in conjunction with other rope access solutions to access harder to reach areas. As part of the planning process, we will always give you an honest recommendation of the best form of access for your project.

How do you attach the ropes to my building?

Ropes are usually attached to structural elements of your building, which we will inspect before use. Where a building has no suitable anchors, we can install and test them, or work from a temporary system.

Will the building have to close while you work?

No. Entrances and pavements stay open in most cases. The area directly below will be cordoned off as an exclusion zone, and managed by a member of staff if needed. These areas will always be communicated with residents and members of staff.

What paperwork do I get before work starts?

A site-specific risk assessment and method statement, including the rescue plan for the job, plus a written scope and price. A copy of our insurance certificate is available if you need one for your records.

Can you work on a listed building?